Why solar installations need access
Installers work on the roof slope fixing rails and mounting panels, and they need to lift each panel – which is large and awkward – from the ground to the roof. A scaffold at eaves level with edge protection gives them a working platform, a barrier at the roof edge and a place to stage panels.
Some installations, particularly on bungalows or where the roof is very accessible, may use other access methods, but scaffolding is the common approach on two-storey houses.
What the scaffold usually looks like
- A platform at or just below gutter level on the elevation with panels
- Edge protection rising above the eaves
- Ladder access within the scaffold
- Sometimes a loading point to lift panels safely
- On some jobs, access to the gable or valley for cabling
Who arranges and pays for it
Many solar installers include scaffolding in their quote and use a scaffolding company they know. Others ask the customer to arrange it. Either way, check the quote: it should say whether scaffolding is included, how long it's needed and who is responsible for it.
If you're arranging scaffolding yourself, share the installer's requirements – which roof slope, the dates and how long they expect to need it – with scaffolding companies.
Ready to get prices?
Describe your project and compare free scaffolding quotes from local companies – there's no obligation.
- Free to use
- No obligation
- Local scaffolding companies
- Quick online form
You'll continue to our quotes partner, MyJobQuote, to describe your scaffolding job.
How long the scaffold stays up
Many domestic solar installations take a few days, but the scaffold is often booked for a little longer to allow for weather and any electrical work. Ask the installer for a realistic timescale and check the weekly rate if the job overruns.
Pavement and neighbours
If the panels are on the front slope of a terrace, the scaffold may need a pavement licence. On semis and terraces, the scaffold may also extend near the neighbour's property, so let them know in advance.